Damaged Floor
repair13.jpg (15201 bytes)

Shot Blasting
repair14.jpg (14287 bytes)

Survey Levels
repair15.jpg (13039 bytes)

Prime Surface
repair16.jpg (13142 bytes)

Pump apply Screed
repair17.jpg (13022 bytes)

New floor in 24 hours
repair18.jpg (14540 bytes)

Coloured flooring
repair19.jpg (13644 bytes)

Epoxy coating
repair20.jpg (10658 bytes)

Extremely durable
repair21.jpg (22796 bytes)

Self leveling
repair22.jpg (10779 bytes)

Very quick
repair24.jpg (8333 bytes)

 

 

 





 




 

 

 

 

 

JOINT REPAIR

Typical Breakdown

 

 

 

 

Saw cut just past the edge of breakage.
Width      Depth
(mm)        (mm)
3-30         12-20
30-100    20-25

 

Clean out debris, blow out & choke off base, with silica sand.

Install MM80 flush or slightly crowned
Width        Filler
(mm)          (%)
<12             0
>12             250

 

 

CRACKS

If a crack has no "islands" , no edge chipping and is less than a credit card thickness it should not be saw cut open. Brush apply a protective coating of liquid MM80. If wider than a credit card thickness apply a bead of Crack Fill and allow to seep into the crack. Re-apply until no further penetration. Allow to cure. Razor cut off excess.

Norton Construction Products  Pty Ltd. 
Tel: (011) 465-1868
:peter@norcon.co.za